By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Maritime NewsMaritime NewsMaritime News
  • Home
  • Breaking
  • Maritime
  • Ports
  • Offshore
  • Green
  • Shipyards
  • Casualties
Search
  • Contact
  • Blog
  • Complaint
  • Advertise
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Shell halts Prelude LNG production after fire
Share
Sign In
Notification Show More
Font ResizerAa
Maritime NewsMaritime News
Font ResizerAa
  • Tech News
  • Gadget
  • Technology
  • Mobile
Search
  • Home
    • Home 1
    • Home 2
    • Home 3
    • Home 4
    • Home 5
  • Categories
    • Tech News
    • Gadget
    • Technology
    • Mobile
  • Bookmarks
  • More Foxiz
    • Sitemap
Have an existing account? Sign In
Follow US
  • Contact
  • Blog
  • Complaint
  • Advertise
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Maritime News > Blog > Casualties > Shell halts Prelude LNG production after fire
Casualties

Shell halts Prelude LNG production after fire

Maritime.News
Last updated: December 3, 2021 5:25 pm
Maritime.News
Share
SHARE

by Joey Chua, Argus

Shell has suspended production at the 3.6mn t/yr Prelude floating LNG offshore Western Australia after a fire broke out at the facility on 2 December.

Smoke detected in an electrical utility area triggered the automatic fire detection and management systems on board the Prelude facility in the Browse basin at around 11pm Australian Western Standard Time (03:00 GMT) on 2 December, a Shell spokesperson told Argus.

“The incident resulted in the loss of main power and the facility is currently operating on back-up diesel generators,” the spokesperson said. “While work is underway to restore main power, production on Prelude has been suspended temporarily.”

The spokesperson did not comment on the estimated downtime of the project.

The Prelude facility can produce 69,231t of LNG, or around 1.2 cargoes in a week at nameplate capacity, assuming a 60,000t cargo size.

One cargo from the project may be delayed and another may be cancelled as a result of the shutdown, market participants said, but this could not be confirmed.

Shell operates Prelude LNG with a 67.5pc stake. Japanese upstream firm Inpex has a 17.5pc stake while South Korea’s state-controlled import Kogas and Taiwan’s state-controlled CPC own 10pc and 5pc, respectively.

Shell, Kogas and CPC receive term volumes from Prelude on a fob basis. Japan’s state-controlled Jera and Shizuoka Gas receive Prelude cargoes from Inpex’s equity volumes on a des basis.

Prelude has been dogged by production issues since it began shipments in June 2019. Production at the plant was halted in February 2020 due to technical issues and resumed around 11 months later in January this year.

Shell said in February that the project will reach full capacity by summer. Prelude loaded four cargoes in each month across June-September, except August when it loaded three cargoes, according to vessel tracking data from oil analytics firm Vortexa.

This was a slight increase of its two monthly loadings in January and February, three in March, four in April, and none in May. It loaded two cargoes in October, three in November, and none so far this month, Vortexa data showed.

The last loading was on 26 November by the 147,608m³ Symphonic Breeze vessel, which departed the facility a day later and is expected to arrive at the Inpex-operated Naoetsu terminal in Japan’s Niigata prefecture on 9 December, according to Vortexa.

This is the second LNG production outage in Australia this week and comes just before the northern hemisphere peak winter demand season. Chevron has suspended operations at the third 5.2mn t/yr liquefaction train at the 15.6mn t/yr Chevron-operated Gorgon LNG in Australia to repair “piping associated with the dehydration unit”, the firm told Argus on 1 December.

Around 2-3 cargoes are expected to be lost from the Gorgon outage so far, market participants said. The cargoes are likely meant to be delivered at the end of December and first-half January to three of the project’s owners, they added, although this could not be confirmed.

The front half-month ANEA price, the Argus assessment for spot LNG deliveries to northeast Asia, was last assessed at $36.185/mn Btu for first-half January on 2 December, up slightly from $35.880/mn Btu for second-half December a week earlier and nearly fivefold $8.105/mn Btu on 2 December 2020.

You Might Also Like

NYK PCTC rescues seafarers in the Red Sea

Captain of Maersk Batam Medevaced

Satellite images show possible pollution after the incident with m/v VYSOS near the Ukrainian Bystroye channel

Portree Lifeboat responds to a MayDay call from a grounded cargo ship, MV Kaami

Rough seas break tanker in two, crew rescued by Armed Forces of Malta

Sign Up For Daily Newsletter

Be keep up! Get the latest breaking news delivered straight to your inbox.
[mc4wp_form]
By signing up, you agree to our Terms of Use and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Twitter Copy Link Print
Share
Previous Article ClassNK adds liquefied hydrogen carrier to its register – World’s first liquefied hydrogen carrier built by Kawasaki Heavy Industries
Next Article World’s First Zero-emission Fuel Tanker
Leave a comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

248.1kLike
69.1kFollow
134kPin
54.3kFollow
banner banner
Create an Amazing Newspaper
Discover thousands of options, easy to customize layouts, one-click to import demo and much more.
Learn More

Latest News

Jumbo installs wind assisted propulsion to Jumbo Jubilee in latest decarbonisation move
Maritime News
ClassNK awards first-ever notation for safe transportation of EVs to MOL’s car carrier ‘CERULEAN ACE’
Maritime News
The international community is suffering a complete failure in the Red Sea and the fight against the Houthis
Breaking Maritime News
“Lila Norfolk”: No piracy attack at all
Breaking Maritime News
Maritime NewsMaritime News
Follow US
© 2024 Maritime.News by Maritime.bg
Join Us!
Subscribe to our newsletter and never miss our latest news, podcasts etc..
[mc4wp_form]
Zero spam, Unsubscribe at any time.
Welcome Back!

Sign in to your account

Lost your password?